← Back to HybridStepped

Position Calculation Breakdown

BCHUSDT (SHORT)

MAJOR MISMATCH - Wrong Size

1 Account Equity

Master Equity

$64601.06

PKS

Slave Equity

$29655.98

HybridStepped

Equity Override Active

Using override value: $30000.00 instead of actual equity

Effective Slave Equity for Calculation

$30000.00

2 Ratio Calculation

Base Ratio = Slave Equity / Master Equity

Base Ratio = $30000.00 / $64601.06 = 0.464389

Multiplier Applied

Effective Ratio = 0.464389 × 3.5 = 1.625360

3 Expected Position Size

Expected Slave Qty = Master Qty × Effective Ratio

Expected = 3.90100000 × 1.625360 = 6.34053064

Master Position

3.90100000

Expected Slave Position

6.34053064

4 Actual vs Expected

Expected

6.34053064

Actual

7.65000000

Deviation

20.65%

Quantity Deviation

+1.30946936

Notional Deviation (USD)

+$269.04

Mark Price: $205.46

Summary Formula

Expected Qty = Master Qty × (Slave Equity / Master Equity) × Multiplier

6.34053064 = 3.90100000 × ($30000.00 / $64601.06) × 3.5