← Back to HybridStepped

Position Calculation Breakdown

BTWUSDT (LONG)

MAJOR MISMATCH - Wrong Size

1 Account Equity

Master Equity

$64601.06

PKS

Slave Equity

$29655.98

HybridStepped

Equity Override Active

Using override value: $30000.00 instead of actual equity

Effective Slave Equity for Calculation

$30000.00

2 Ratio Calculation

Base Ratio = Slave Equity / Master Equity

Base Ratio = $30000.00 / $64601.06 = 0.464389

Multiplier Applied

Effective Ratio = 0.464389 × 3.5 = 1.625360

3 Expected Position Size

Expected Slave Qty = Master Qty × Effective Ratio

Expected = 30020.00000000 × 1.625360 = 48793.31701368

Master Position

30020.00000000

Expected Slave Position

48793.31701368

4 Actual vs Expected

Expected

48793.31701368

Actual

59973.00000000

Deviation

22.91%

Quantity Deviation

+11179.68298632

Notional Deviation (USD)

+$696.86

Mark Price: $0.06

Summary Formula

Expected Qty = Master Qty × (Slave Equity / Master Equity) × Multiplier

48793.31701368 = 30020.00000000 × ($30000.00 / $64601.06) × 3.5