← Back to HybridStepped

Position Calculation Breakdown

MOVEUSDT (SHORT)

MAJOR MISMATCH - Wrong Size

1 Account Equity

Master Equity

$64601.06

PKS

Slave Equity

$29655.98

HybridStepped

Equity Override Active

Using override value: $30000.00 instead of actual equity

Effective Slave Equity for Calculation

$30000.00

2 Ratio Calculation

Base Ratio = Slave Equity / Master Equity

Base Ratio = $30000.00 / $64601.06 = 0.464389

Multiplier Applied

Effective Ratio = 0.464389 × 3.5 = 1.625360

3 Expected Position Size

Expected Slave Qty = Master Qty × Effective Ratio

Expected = 276652.00000000 × 1.625360 = 449659.18515888

Master Position

276652.00000000

Expected Slave Position

449659.18515888

4 Actual vs Expected

Expected

449659.18515888

Actual

543691.00000000

Deviation

20.91%

Quantity Deviation

+94031.81484112

Notional Deviation (USD)

+$1396.37

Mark Price: $0.01

Summary Formula

Expected Qty = Master Qty × (Slave Equity / Master Equity) × Multiplier

449659.18515888 = 276652.00000000 × ($30000.00 / $64601.06) × 3.5