← Back to HybridStepped

Position Calculation Breakdown

NILUSDT (SHORT)

CRITICAL MISMATCH - Wrong Size

1 Account Equity

Master Equity

$64601.06

PKS

Slave Equity

$29655.98

HybridStepped

Equity Override Active

Using override value: $30000.00 instead of actual equity

Effective Slave Equity for Calculation

$30000.00

2 Ratio Calculation

Base Ratio = Slave Equity / Master Equity

Base Ratio = $30000.00 / $64601.06 = 0.464389

Multiplier Applied

Effective Ratio = 0.464389 × 3.5 = 1.625360

3 Expected Position Size

Expected Slave Qty = Master Qty × Effective Ratio

Expected = 0.10000000 × 1.625360 = 0.16253603

Master Position

0.10000000

Expected Slave Position

0.16253603

4 Actual vs Expected

Expected

0.16253603

Actual

129.50000000

Deviation

79574.64%

Quantity Deviation

+129.33746397

Notional Deviation (USD)

+$4.98

Mark Price: $0.04

Summary Formula

Expected Qty = Master Qty × (Slave Equity / Master Equity) × Multiplier

0.16253603 = 0.10000000 × ($30000.00 / $64601.06) × 3.5