← Back to HybridStepped

Position Calculation Breakdown

SIRENUSDT (SHORT)

Position OK - Within tolerance

1 Account Equity

Master Equity

$64601.06

PKS

Slave Equity

$29655.98

HybridStepped

Equity Override Active

Using override value: $30000.00 instead of actual equity

Effective Slave Equity for Calculation

$30000.00

2 Ratio Calculation

Base Ratio = Slave Equity / Master Equity

Base Ratio = $30000.00 / $64601.06 = 0.464389

Multiplier Applied

Effective Ratio = 0.464389 × 3.5 = 1.625360

3 Expected Position Size

Expected Slave Qty = Master Qty × Effective Ratio

Expected = 44.00000000 × 1.625360 = 71.51585438

Master Position

44.00000000

Expected Slave Position

71.51585438

4 Actual vs Expected

Expected

71.51585438

Actual

88.00000000

Deviation

23.05%

Quantity Deviation

+16.48414562

Notional Deviation (USD)

+$19.90

Mark Price: $1.21

Summary Formula

Expected Qty = Master Qty × (Slave Equity / Master Equity) × Multiplier

71.51585438 = 44.00000000 × ($30000.00 / $64601.06) × 3.5