← Back to GK_BTC

Position Calculation Breakdown

ZECUSDT (LONG)

MAJOR MISMATCH - Wrong Size

1 Account Equity

Master Equity

$64480.40

PKS

Slave Equity

$1948.74

GK_BTC

Equity Override Active

Using override value: $10000.00 instead of actual equity

Effective Slave Equity for Calculation

$10000.00

2 Ratio Calculation

Base Ratio = Slave Equity / Master Equity

Base Ratio = $10000.00 / $64480.40 = 0.155086

Multiplier Applied

Effective Ratio = 0.155086 × 3.5 = 0.542801

3 Expected Position Size

Expected Slave Qty = Master Qty × Effective Ratio

Expected = 9.42600000 × 0.542801 = 5.11643848

Master Position

9.42600000

Expected Slave Position

5.11643848

4 Actual vs Expected

Expected

5.11643848

Actual

5.39100000

Deviation

5.37%

Quantity Deviation

+0.27456152

Notional Deviation (USD)

+$129.13

Mark Price: $470.33

Summary Formula

Expected Qty = Master Qty × (Slave Equity / Master Equity) × Multiplier

5.11643848 = 9.42600000 × ($10000.00 / $64480.40) × 3.5