← Back to V10Safe

Position Calculation Breakdown

BCHUSDT (SHORT)

MAJOR MISMATCH - Wrong Size

1 Account Equity

Master Equity

$64480.40

PKS

Slave Equity

$27790.68

V10Safe

Equity Override Active

Using override value: $30000.00 instead of actual equity

Effective Slave Equity for Calculation

$30000.00

2 Ratio Calculation

Base Ratio = Slave Equity / Master Equity

Base Ratio = $30000.00 / $64480.40 = 0.465258

Multiplier Applied

Effective Ratio = 0.465258 × 3.5 = 1.628402

3 Expected Position Size

Expected Slave Qty = Master Qty × Effective Ratio

Expected = 3.90100000 × 1.628402 = 6.35239546

Master Position

3.90100000

Expected Slave Position

6.35239546

4 Actual vs Expected

Expected

6.35239546

Actual

7.65000000

Deviation

20.43%

Quantity Deviation

+1.29760454

Notional Deviation (USD)

+$267.35

Mark Price: $206.03

Summary Formula

Expected Qty = Master Qty × (Slave Equity / Master Equity) × Multiplier

6.35239546 = 3.90100000 × ($30000.00 / $64480.40) × 3.5