← Back to V10Safe

Position Calculation Breakdown

HEIUSDT (LONG)

Position OK - Within tolerance

1 Account Equity

Master Equity

$64480.40

PKS

Slave Equity

$27790.68

V10Safe

Equity Override Active

Using override value: $30000.00 instead of actual equity

Effective Slave Equity for Calculation

$30000.00

2 Ratio Calculation

Base Ratio = Slave Equity / Master Equity

Base Ratio = $30000.00 / $64480.40 = 0.465258

Multiplier Applied

Effective Ratio = 0.465258 × 3.5 = 1.628402

3 Expected Position Size

Expected Slave Qty = Master Qty × Effective Ratio

Expected = 2613.80000000 × 1.628402 = 4256.31664816

Master Position

2613.80000000

Expected Slave Position

4256.31664816

4 Actual vs Expected

Expected

4256.31664816

Actual

5125.30000000

Deviation

20.42%

Quantity Deviation

+868.98335184

Notional Deviation (USD)

+$77.13

Mark Price: $0.09

Summary Formula

Expected Qty = Master Qty × (Slave Equity / Master Equity) × Multiplier

4256.31664816 = 2613.80000000 × ($30000.00 / $64480.40) × 3.5