← Back to V10Safe

Position Calculation Breakdown

TAOUSDT (SHORT)

MAJOR MISMATCH - Wrong Size

1 Account Equity

Master Equity

$64601.06

PKS

Slave Equity

$28056.66

V10Safe

Equity Override Active

Using override value: $30000.00 instead of actual equity

Effective Slave Equity for Calculation

$30000.00

2 Ratio Calculation

Base Ratio = Slave Equity / Master Equity

Base Ratio = $30000.00 / $64601.06 = 0.464389

Multiplier Applied

Effective Ratio = 0.464389 × 3.5 = 1.625360

3 Expected Position Size

Expected Slave Qty = Master Qty × Effective Ratio

Expected = 3.87100000 × 1.625360 = 6.29176983

Master Position

3.87100000

Expected Slave Position

6.29176983

4 Actual vs Expected

Expected

6.29176983

Actual

7.59000000

Deviation

20.63%

Quantity Deviation

+1.29823017

Notional Deviation (USD)

+$279.52

Mark Price: $215.31

Summary Formula

Expected Qty = Master Qty × (Slave Equity / Master Equity) × Multiplier

6.29176983 = 3.87100000 × ($30000.00 / $64601.06) × 3.5